|
|
|
Latest News & Milestones from QC TV Corp.
11/1/09 - Paris ISD & Pogue
Construction award contract for technology systems by PBK Architects
at the new Paris High School in Paris, TX . The technology systems in Paris' new high
school include a TV Broadcast Studio, custom designed sound systems
in the Choir Room, Band Hall, and Cafeteria, along with state of the
art classroom media presentation systems. Bogen's Multicomm 2000 is
in place for the PA, Clocks and Bells. The football stadium and
indoor practice facility sound systems are included in the
technology package.
8/21/09 - QCTV completed technology
upgrades at two high schools & one middle school for Rockwall
ISD in Rockwall, TX. The technology systems in RockWall High School,
Heath High School and Utley Middle School were completed on schedule
with Pogue Construction's Renovations and Additions Project at the
three schools. These projects were SHW Group Architects and Estes,
McClure & Associates designs which incorporate a stand alone
local sound system in each classroom integrated into the local media
and CATV presentation system.
8/1/09 - QCTV opens DFW office.
In order to provide
better customer support, QCTV opened its DFW office at:
605 S. Sherman St., Suite 705-G Richardson, TX.
75081
3/15/09 - QCTV completes 3 SchoolView
Showcase schools along with upgrades to existing
systems. Lake Travis
High School in Lake Travis ISD and upgrades to Franklin High School
and Reynolds Elementary School in Franklin ISD were the first and
only installations requiring the daunting task of integrating 1st
& 2nd generation CampusSV hardware. Lake Travis Serene Hills
Elmentary School (#5) and Franklin Middle School were two of the
first locations to use the self contained EZRoom system with
SchoolView's CampusSV system. CampusSV incorporates audio
distribution of PA and bells over an IP network, while controlling
clocks. Additionally, the System provides source control of
classroom presentation systems to projectors from classroom document
camera, the teacher's computer or a digital video programs delivered
over the network from either a server or a portable broadcast
cart.
9/12/08 - Summer 2008 - Technology
upgrades in 350 rooms at 8 elementary and middle schools completed
for Rockwall ISD in Rockwall, TX. The technology systems in eight elementary and
middle schools were completed within 60 days. The projects were
Estes, McClure & Associates designs which incorporated a stand
alone local sound system, presentation cabling, and projector in
each classroom integrated into the local media and CATV presentation
system.
QC TV Corp. The trusted name in broadband
video distribution and integrated audio visual systems since
1986. Broadband & AV Systems Design & Integration,
Consulting, Installation, Training, Technical Support, Repair &
Extended Warranty.
|
|